Fig. 01 — Residential

Maitama Private Residence

Cast-in-place concrete and hardwood — a private home designed around a mature mango tree.

Location

Maitama, Abuja

Completed

2024

Scope

640 sqm

Fig. 02 — Commercial

Wuse Commerce Hall

Three-storey Grade-A office shell with full-height glazing and exposed concrete frame.

Location

Wuse II, Abuja

Completed

2023

Scope

5,800 sqm

Fig. 03 — Infrastructure

Kubwa Overpass

Steel-and-concrete pedestrian overpass connecting two arterial road corridors.

Location

Kubwa, FCT

Completed

2022

Scope

380 m

Fig. 04 — Adaptive Reuse

Gwarinpa Mixed-Use

Former warehouse converted to ground-floor retail with 84 residential units above.

Location

Gwarinpa, Abuja

Completed

2024

Scope

11,000 sqm